Roof system

The roof system, layer by layer

A roof that lasts is six layers installed in the right order. Turn the house, take the roof apart and see where each layer goes.

Six layers between your home and the weather.

A roof that lasts is a system installed in the right order. Choose a layer to see what we install and what we check before it is covered.

Roof deck

The plywood the whole roof is fastened to. After the tear-off we walk it and replace soft or damaged boards before anything goes on top.

  • Soft spots and rot
  • Loose or damaged boards
A small house with a gable roof, its six roofing layers lifted apart: roof deck, ice and water shield, underlayment, metal flashing, architectural shingles and ridge vent with ridge cap

Materials we install

  • GAFArchitectural shingles and roofing system components
  • Owens CorningArchitectural shingles and roofing system components
  • EPDMRubber membrane for flat and low-slope roofs

What each layer does

What we install on a full roof replacement, from the deck up.

01

Roof deck

The OSB or plywood sheathing fastened to the rafters. Every other layer is nailed into it, so after a tear-off we walk the whole deck and replace soft, rotted or delaminated boards before anything goes on top.

02

Ice and water shield

A self-adhering rubberized membrane installed at the eaves, in valleys and around chimneys, skylights and vents. It seals around nails and stops water that ice dams or wind-driven rain push under the shingles.

03

Underlayment

A synthetic, water-resistant sheet over the rest of the deck, lapped so water always runs over the course below. It keeps the deck dry during installation and is the second line of defense if a shingle fails.

04

Flashing

Metal where the roof meets an edge or a wall: drip edge at the eaves and rakes, step and counter flashing at chimneys and walls, and boots around plumbing vents. Most leaks start at these joints.

05

Shingles

A starter course along the edges, then architectural asphalt shingles laid in staggered courses and fastened in the pattern the manufacturer specifies. Their laminated layers give depth and shed water down the roof.

06

Ridge cap and ventilation

A ridge vent along the peak lets warm, moist attic air escape while soffit vents bring fresh air in. Ridge cap shingles cover the vent and finish the peak. Good airflow helps prevent ice dams and keeps the deck dry.

Old plank decking exposed after a tear-off
Layer 1: the deck, exposed and checked
Synthetic underlayment installed with shingle bundles staged on the roof
Layer 3: synthetic underlayment, then shingles
Crew working along the ridge with new decking
Layer 6: work at the ridge
Roof replacementRoof inspectionRoof ventilation

Roof system questions

Why does the order of the layers matter?

Each layer laps over the one below so water always runs downhill and outward. Installing a layer out of order, or skipping one, leaves a path for water that shingles alone cannot stop.

Where does ice and water shield go?

At the eaves, in valleys and around chimneys, skylights and other penetrations, where ice dams and wind-driven rain push water under the shingles.

Do you replace the flashing during a roof replacement?

We inspect all flashing and replace drip edge, pipe boots and any step or counter flashing that is worn, rusted or poorly installed.

Get a free roof inspection.

Three short steps. We reply to every request personally, and for a leak or storm damage, calling is fastest.

Call the office(603) 404-1792
Hours
Monday to Friday, 8 am to 5 pm
Saturday, 9 am to 3 pm
Area
New Hampshire, Massachusetts and Southern Maine

Step 1 of 3

What do you need?

Call Free estimate